1.Consider future condition of stream Measure
setback from inboard side of levee
2.Consider emergency access - Site buildings
15’to 20’ from outboard levee toe
3.Urge adherence to Riparian Corridor policy
–minimize exceptions-
4.Incorporate protection and enhancement measures
on SFD
5.